Global InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps Software
Investment Commodities Properties Equipment Consultants EduMine Technology Events Mineweb
Blogs Mine Sites Mine Costs About Contact eStore Advertise Subscribe MINING.com
 

JABAL SHAYBAN

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
JABAL SHAYBAN
Classification: Active/Verified
Status: Exploration
Type of Work: Surface
Location:
Saudi Arabia
Nearest Landmark: JEDDAH
Distance from Landmark: 150 km
Direction from Landmark: NE
Latitude: N/A
Longitude: N/A
  • Property Map
Advanced or Above
    Subscriber Access Required


Property News

July 7, 2009
Citadel Resource Group reported results from its third RC drilling program at the Company’s 100%-owned Shayban Gold project in Saudi Arabia. Significant results include 13m at 4.19 g/t Au from 22m in Hole SH079RC, 21m at 3.08 g/t Au from 55m in HoleSH080RC, 40m at 1.66 g/t Au from 58m in HoleSH088RC, 11m at 6.29 g/t Au from 21m in HoleSH090RC and 43m at 9.38 g/t Au from 11m in HoleSH091RC. The holes announced within this report have both extended and, in places, in-filled the Shayban deposit. Drilling continues to focus on extending the northern section of the deposit to the north, west and east, the central portion of the deposit to the east and the southern portion of the deposit to the south down plunge.
February 23, 2009
Citadel Resource Group Limited announce that it has received further high-grade assay results from the second drilling program at the Company’s 100%-owned Shayban Gold Project in Saudi Arabia. Gold assay results have been received for a further four reverse circulation (“RC”) drill holes of the completed 36 hole drilling program. All holes intersected significant gold mineralization from surface, or near surface. Results include 35m at 13.48 g/t Au from 9m including 10m at 32.70 g/t Au from 11m (SH068RC), 11m at 1.83 g/t Au from 40m and 6m at 3.21 g/t Au from 59m (SH074RC), and 2m at 4.52 g/t Au from 34m (SH076RC). Silver and base metal results are pending.
February 23, 2009
Announced the results from the second drilling program. All holes intersected significant gold mineralization from surface, or near surface. Results include 35m at 13.48 g/t Au from 9m including 10m at 32.70 g/t Au from 11m (SH068RC), 11m at 1.83 g/t Au from 40m and 6m at 3.21 g/t Au from 59m (SH074RC), and 2m at 4.52 g/t Au from 34m (SH076RC). Silver and base metal results are pending and should be available in a further four weeks.
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish