JAMBI
|
|
Key Facts
Location:
Indonesia
0 km of CENTRAL SULAWESI Commodities: Gold
New to Company & PropertyMine?
Start Here » Comparable Properties
|
Latest Information January 31, 1997 3,323 ft of core drilling were compiled on the Middle Ampar and Kesirih Kiri prospects. 877 float, channel and rock chip samples were collected from the Amper, Batang, Asai, Upper Tankui, Mentenung and Kesirih Kiri prospects. January 31, 1997 3,323 ft of core drilling were compiled on the Middle Ampar and Kesirih Kiri prospects. 877 float, channel and rock chip samples were collected from the Amper, Batang, Asai, Upper Tankui, Mentenung and Kesirih Kiri prospects. September 30, 1996 Initial work was to consist of mapping, trenching and sampling with shallow DDH drilling scheduled to begin in 3 weeks. As of early/96, field work was expected to commence in early May. Past work indicated a number of gold in stream sediment anomalies which required follow-up. (Jul/95) |