• InfoMiner
  • LinkedIn
  • InfoMine Feed

JOLIMONT
Archived

Key Facts
Status: Raw Prospect
Type of Work: Surface
Location: Australia
                 

New to Company & PropertyMine?
Start Here »


Latest Information
July 31, 2001
A 61 hole RAB program (1,358 metres) and a single diamond drill hole (267 metres) were completed at the Killer Bore prospect.The RAB drilling returned a number of anomalous intervals of greater than 100 ppm zinc, but there were no associated Pb and Ag anomalies. The diamond drill hole (DDH01KB001) was designed to test a magnetic source near an earlier reverse circulation hole that returned 8m @ 3.1% Zn within an envelope of favourable alteration.The interval from 108-112 metres returned 4 metres at 10.0% Zn.
July 31, 2001
A 61 hole RAB program (1,358 metres) and a single diamond drill hole (267 metres) were completed at the Killer Bore prospect.The RAB drilling returned a number of anomalous intervals of greater than 100 ppm zinc, but there were no associated Pb and Ag anomalies. The diamond drill hole (DDH01KB001) was designed to test a magnetic source near an earlier reverse circulation hole that returned 8m @ 3.1% Zn within an envelope of favourable alteration.The interval from 108-112 metres returned 4 metres at 10.0% Zn.

Copyright © InfoMine Inc. Developed and maintained by InfoMine Inc. All rights reserved.