September 30, 1999 Mineralization covered an area 1,500 m long x 200 - 600 m wide and had been drilled off to a depth to 260 m below surface. Potential for deeper mineralization exists. About 300,000 tonnes of ore grading 4% Cu and 0.3% Co was stockpiled on the deposit.
September 30, 1999 Mineralization covered an area 1,500 m long x 200 - 600 m wide and had been drilled off to a depth to 260 m below surface. Potential for deeper mineralization exists. About 300,000 tonnes of ore grading 4% Cu and 0.3% Co was stockpiled on the deposit.
December 31, 1998 29,500 m of drilling and 450 m of drifting were completed and a resource estimate had been calculated.