April 30, 1999 A furll scale bankable feasibility report was being prepared to bring the project into commercial production. The mineralized area presently extends from surface to 220 m at a dip of 18% along a strike length of 1,000 m, is up to 200 m wide, and contains 7 million pounds of U308 and 15 million pounds of V205 based on drilling to date.
April 30, 1999 A furll scale bankable feasibility report was being prepared to bring the project into commercial production. The mineralized area presently extends from surface to 220 m at a dip of 18% along a strike length of 1,000 m, is up to 200 m wide, and contains 7 million pounds of U308 and 15 million pounds of V205 based on drilling to date.
December 31, 1998 Work conducted on the property included airborne surveys and some 54,000 meters of drilling.