Global InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps Software
Investment Commodities Properties Equipment Consultants EduMine Technology Events InfoMiner
Charts & Data Mine Sites Mine Costs About Contact eStore Advertise Subscribe MINING.com
SITE SEARCH

KNP/ GOONGARRIE

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
KNP/ GOONGARRIE
Classification: Active/Verified
Status: Prefeasibility
Type of Work: Surface
Location: Australia, Western Australia
Research - Professional or Research - Advanced Subscriber Access Required
Subscribe Today


Property News

October 26, 2011
Heron Resources announced the completion of an initial Mineral Resource estimate for the Goongarrie South iron-nickel deposit part of the Kalgoorlie Nickel Project in Western Australia.
February 16, 2010
Heron Resources announced the conclusion of its review and revision of the pre-feasibility study (PFS) for the Kalgoorlie Nickel Project, Western Australia. The revision has resulted in a larger project with lower operating costs and lower capital intensity per pound of nickel production, better resource utilisation and a more even production profile. The updated resource estimates for the Highway, Goongarrie Hill, Goongarrie South, Siberia North and Big Four deposits were generated using an approach that accounts for mining parameters (recoverable resources) which was not considered in the previous resource estimates (in-situ geological resources).
February 9, 2009
Announced results of the Pre-Feasibility Study at its Kalgoorlie Nickel Project. The Study indicates a project producing up to 36,000 tonnes of mixed nickel cobalt hydroxide product via the high pressure acid leach (HPAL) process, with a capital cost of US$1.5 billion and an operating cost of US$4.42 per pound of production based on a 0.75 USD:AUD exchange rate. Vale’s study is based on a project treating 2.5 Mt of beneficiated leach feed ore per annum through a two autoclave leaching circuit over a project life of 34 years.
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish