|
Property NewsFebruary 8, 2011 Ventana Gold Corp. announced results from thirteen additional holes at its La Bodega gold, silver and copper project in Colombia. January 14, 2011 Ventana Gold Corp. announced that it has filed its National Instrument 43-101 technical report, announced on November 8, 2010, in respect of its initial resource estimate and scoping study for the La Bodega project located in Colombia. The report disclosed initial mineral resource estimate of 27 million tonnes grading 3.9 grams per tonne gold, 21.5 grams per tonne silver, and 0.14% copper for a total of 3.5 million ounces of gold, 19.2 million ounces of silver and 84.6 million pounds of copper, each in an inferred resource category, at a cut-off grade of 2.0 grams of gold per tonne. Fig. 1 - La Bodega Location January 10, 2011 Ventana Gold Corp. announced results from thirteen additional holes drilled on multiple exploration targets within its La Bodega gold, silver and copper project in Colombia. Highlights include; Hole DDH-10-LB-351 which intersected 28.65 m at 2.39 g/t gold, 11.21 g/t silver and 0.04% copper from 257.35 m and Hole DDH-10-LB-357 which intersected 68.70 m at 5.43 g/t gold, 29.89 g/t silver and 0.14% copper from 206.30 m.
|