September 18, 2007 Early stage planning for these insitu leases was underway and will include an evaluation drilling program of approximately 19 wells during the 2006/2007 winter drilling season.
September 18, 2007 Early stage planning for these insitu leases was underway and will include an evaluation drilling program of approximately 19 wells during the 2006/2007 winter drilling season.
June 30, 2007 Purchased Leases 418 and 419, both of which are contiguous to the existing in-situ leases.