May 31, 2011 US GOLD CORPORATION announced drilling results from the Cadillac Area on the Limo Project, Nevada, USA.
January 11, 2011 US GOLD CORPORATION announced drill results from its Limo Project in Nevada, USA. Highlights include; Hole LB80 which intersected 94.5 m at 1.29 g/t gold from 181 m including 4.6 m at 4.93 g/t gold from 267 m. This zone is open to the south, east, north and at depth where further drilling is planned to begin in February.
December 6, 2010 US Gold Corp. announced assay results of the recent drilling at Limo and Gold Bar projects located in Nevada, USA. Highlights include 6.4 m of 853 g/t silver and 1.77 g/t gold from 15.5 m. Results of the drilling continued to focus on expanding the gold mineralization beyond the current resource.