The geochemical sampling remains unfinished, with assay results pending.
In 1996 two mineralized zones have been trenched on the property: the Boulder Lode and the Buckland Shear (BUKS).
In 1994 mapping, surveying of pre-existing trenches and the drilling of two core holes totalling 397.6 m to test the Buckland Shear Zone were completed.
September 30, 1996
The geochemical sampling remains unfinished, with assay results pending.
In 1996 two mineralized zones have been trenched on the property: the Boulder Lode and the Buckland Shear (BUKS).
In 1994 mapping, surveying of pre-existing trenches and the drilling of two core holes totalling 397.6 m to test the Buckland Shear Zone were completed.
May 31, 1993
Completed 27 RC holes, drilled to an average depth of 75 metres, results (2975 E09).