|
Property NewsSeptember 30, 2008 The Company completed all radon surveys. The Company set a new plan of operations to include a 6 drill hole program to test the southern area of the property and to penetrate the diabase sill. The mining permit application has been received and drilling is planned for the first quarter of 2009.Golden Patriot is in Year 1 of a four-year work program. At the time of this report, Golden Patriot has spent approximately US$500,000 on exploration costs, which includes US$50,000 in property payments. Exploration work consisted of geological mapping and sampling, geochemical and radiometric surveying, and line-cutting. All samples were processed by SGS Laboratories. Preliminary results on the rock samples reported encouraging uranium grades January 31, 2007 A reverse circulation drill program has been completed totaling 3,430 feet in 23 holes, testing geological and anomalous areas. According to Golden Patriot’s report, the results delineated mineralization over a strike length of approximately 398 feet. Values from three holes ranged from 0.092% - 0.12% U3O8. January 25, 2007 Rodinia Minerals announced the results of the recently completed drilling program at the Lucky Boy property located in Arizona, USA.
|