No further work was being considered at this stage on the property due to the small size of the resource.
January 31, 1999
No further work was being considered at this stage on the property due to the small size of the resource.
August 31, 1998
An RC drill program returned lower grades and widths than anticipated from trench sampling. Intersections include: 42 m averaging 3.4 g/t, 31 m averaging 1.4 g/t, 14 m averaging 4.9 g/t and 68 m averaging 1.5 g/t.