MAURITANIAN METAL PERMITS
|
Property NewsSeptember 30, 2001 Drilling was completed, returning up to 0.61% Ni and 1.33 g/t PGE + Au over 15 m. September 30, 2001 Drilling was completed, returning up to 0.61% Ni and 1.33 g/t PGE + Au over 15 m. March 31, 2001 At the Karet South permit, nine (9) additional drill holes were planned for Apr-May/01 on the gossan where previously the company found a drill intersection of 0.89% nickel and 0.95 g/t combined platinum and palladium (1.64 g/t combined gold and platinum groups metals) over a 20 metre thickness at a depth of 18 to 38 metres. It is hoped that the additional drill holes will define the extent of the nickel-platinum-palladium mineralisation of this gossan.
|