Reported drill results. An intercept from drill hole MM-08-05 intersected 11.3m @ 4.18g/t Au from 341.3m.
April 28, 2008
Diamond drilling has commenced. The drilling program will consist of a minimum of five diamond drill holes comprising 5,576 ft. (1,700 metres). This campaign will have the objective of continuing to define further extensions of the high grade gold values intersected in drilling campaigns on the property in 2004 through to 2007.
March 1, 2007
Assay results were reported and include 1 m grading 11.11 g/t Au from 438.0 m in hole MM-06-01.