June 30, 2006
The Company has completed 24 RC drillholes for 1,754m since June 2005 at Middagsberget. By applying a 0.5 g/t, Au lower cut-off grade the best results include: RC09: 5m at 3.5 g/t Au from 20m, including 1m at 12.0 g/t Au; RC12: 1m at 12.9 g/t Au from 57m, RC13: 2m at 4.1 g/t Au from 34m, RC14: 4m at 1.5 g/t Au from 63m.