|
Property NewsJune 30, 2008 Announced that core from the first two holes drilled show evidence of Molybdenum
mineralisation, confirming a mineralised strike of at least +600 metres. October 31, 2006 Concluded a major drilling operation on the project. The company drilled 2,592 metres of RC drilling and completed 1603 meters in 24 holes. Highlights from the recent Mojiang drilling included MJDDH009 intersecting 10.12 g/t gold over 26.00 metres an MJRC057 intersecting 4.84 g/t gold over 5.00 metres. June 30, 2006 Announced that the company was conducting due diligence on the Chinese exploration assets. MJDDH009 intersected 10.12 g/t gold over 26.00 metres; MJDDH013 intersected 2.05 g/t gold over 14metres; MJDDH018 intersected 8.31 g/t gold over 1.75 metres
|