A bore hole electromagnetic anomaly was drilled and intersected sulphides with some chalcopyrite mineralization in altered felsic volcanics. Two grids were cut and surveyed to check previously undetected airborne anomalies. No anomalies were located. A cross grid (90% to the previous direction) on one target was being cut and was to be covered by a ground geophysical survey.
In 1997/98, ground electromagnetic surveys were conducted on the property but failed to locate the previously identified airborne electromagnetic anomalies. Further diamond drilling and electromagnetic surveys were planned for the down-hole anomaly.
June 30, 1999
A bore hole electromagnetic anomaly was drilled and intersected sulphides with some chalcopyrite mineralization in altered felsic volcanics. Two grids were cut and surveyed to check previously undetected airborne anomalies. No anomalies were located. A cross grid (90% to the previous direction) on one target was being cut and was to be covered by a ground geophysical survey.
In 1997/98, ground electromagnetic surveys were conducted on the property but failed to locate the previously identified airborne electromagnetic anomalies. Further diamond drilling and electromagnetic surveys were planned for the down-hole anomaly.