A 40 metre decline and raise had failed to confirm continuity of the zone.
November 30, 1994
A 40 metre decline and raise had failed to confirm continuity of the zone.
May 31, 1994
A 900 tonne underground bulk sample and 1,000 metres of core drilling in 14 holes are planned to test the Victoria Vein, and trenching is planned to test other structures.
During 1992-93 a 172 tonne bulk sample was extracted from an open cut and processed at the Premier Mill in Stewart B.C. to recover an average 66 g/tonne gold.
In 1991 core drilling tested the high grade ore shoot.
In 1990 trenching was done.