Mineralization was open at depth and an extensive drilling campaign of the sulphide mineralisation below the pit has been undertaken.
August 31, 2000
And Sep/02, the mine produced 22,500 ounces of gold from the heap leaching of 213,000 tonnes of weathered ore. Irrigation of the dumps continued until Aug/04 with some minor gold recovery.