Further assessment of data including computer modelling of the historic mines was conducted. A drill program planned to have been executed later this year has been postponed as a result of property access issues and falling base metals prices.
June 30, 2008
Further assessment of data was conducted with the view to planning a drill program to be executed later this year.
March 31, 2008
Surface rock chip samples returned values up to 1.08% lead, 14% copper, 75.5 g/t silver and 0.48% zinc along strike of the historic Protheroe and Narra Tarra Mines. In addition, more regional rock chip sampling of gossanous material 3km to the northeast and 2km southeast of the historic mine location returned samples up to 4.47% lead, 0.15% copper, and 10.4% zinc. Limited soil sampling over the area to the south of the tailings dump at the Protheroe and Narra Tarra mines also defined several new targets with the same strike as the
known mineralisation.