October 27, 2010 Clancy Exploration reported the results of diamond drilling at its Orange East project located in Northern Territory, Australia. Highlights include hole OED018 which intersected 0.5 m of 1.24% copper from 96.0 m and 0.5 m of 1.74% copper from 121.0 m and hole OED011 which intersected 1.0 m at 0.67g/t gold from 98.0 m and 1.0 m at 1.13g/t gold from 113.0 m.
October 29, 2009 Clancy Exploration Limited announce the results of the recent round of RC drilling at its 100% owned Orange East project (EL6181) in New South Wales, Australia. The company reports that eight of the 10 holes drilled intersected significant mineralization. Some of the better intersections include 10m @ 0.29% copper, incl. 4m @ 0.55% copper (OERC001), 2m @ 1.09g/t gold and 2m @ 0.67g/t gold (OERC004), and 2m @ 0.44% copper, incl. 1m @ 1.32% copper & 0.11g/t gold (OERC005). Further drilling is planned.
August 12, 2009 Clancy Exploration Limited announce further positive rock chip results from its 100% owned Orange East project (EL6181) in New South Wales, Australia, in advance of a 2000m RC drilling program that is scheduled for early September 2009. The latest results are from rock chip samples collected during a mapping program over the previously reported copper-silver-gold anomalies at Carangera, Wentworth, Springfield and Pendarves in the southern part of EL6181. Results for a further 106 rock chip samples have been received. High grade copper and elevated silver and gold results have been returned from numerous samples, include 19.8% copper, 127 g/t silver and 0.15g/t gold in sample MMR176 and 13.25% copper, 99.5g/t silver and 2.4g/t gold in sample MMR190.