PHYLLIS LAKE
Location:
Canada, Ontario
|
Property NewsNovember 26, 2008 Announced the completion of their Phase 1 drilling. Highlights:
The results from the completed Phase 1 program are as follows:
Hole # 1
From 2.0 to 11.0 metres
9.0 metres grading 0.0204 % Uranium, 470.55 g/t Chromium, 27.40 g/t Gallium, 16.52 g/t Lithium, 18.22 g/t Scandium, 50.66 g/t Vanadium, 26.00 g/t Tellurium, 8.35 g/t Tantalum, 18.09 g/t Strontium, 5.50 g/t Zirconium, 7.23 g/t Cadmium, 1.021 % Calcium, 0.415 % Magnesium, 0.0654 % Manganese, 0.0343 % Titanium, 0.0222 % Copper, 0.0165 % Phosphorous, 15.03 % Sulfur and 28.80 % Iron July 24, 2008 Phase 1 (3000 m) diamond drill program commenced. The JV companies also staked adjacent ground. June 11, 2008 A stripping program carried out by heavy equipment has recently uncovered a number of
large zones with widths and strike lengths. Surface grab sampling highlights:
0.690% Molybdenum (Mo), 2.192 % Copper (Cu), 0.415 % Cobalt (Co), 0.393 % Nickel (Ni), 0.100 % Zinc (Zn), 9.60 g/t Silver (Ag), 2.81 g/t Gold (Au), 2.50 g/t Palladium (Pd) and 1.20 g/t Platinum (Pt).
|