May 31, 1996 1,559 m were drilled in 7 holes results included 228 m grading 0.10% copper and 0.04 g/t gold in hole DDH-4 and 59 m grading 0.24% copper and 0.05 g/t gold in hole DDH-1.
May 31, 1996 1,559 m were drilled in 7 holes results included 228 m grading 0.10% copper and 0.04 g/t gold in hole DDH-4 and 59 m grading 0.24% copper and 0.05 g/t gold in hole DDH-1.
March 31, 1995 Up to 20 m of 2,600 ppm copper and values as high as 200 ppb gold had been returned from a leached stockworks zone.