Property News
September 30, 2004
Production increased 61% to 17,392 MT, and in the plant the pounds produced rose 3.8% due to the higher copper grade of the solution.
March 31, 2002
The mining complex increased production of copper concentrates by 35.8%, producing 67,853 metric tons, due primarily to improved ore grades, a new mine plan and the optimization of installed capacity.
July 31, 1999
While there were no plans to change production levels, unusually hard ore had adversely affected mill throughput that would result in reduced production of approximately 25 million pounds during 1999.