• InfoMiner
  • LinkedIn
  • InfoMine Feed

RED HILL PROPERTY

Cu
3.22
USD/lb
0.00
black
Data as of May 16, 2013 12:00AM UTC
Au
1,359.53
USD/oz
0.02
green
Data as of May 17, 2013 09:59PM UTC
Ag
22.26
USD/oz
0.06
green
Data as of May 17, 2013 09:59PM UTC
Zn
0.81
USD/lb
-0.15
red
Data as of May 16, 2013 12:00AM UTC


Key Facts
Status: Advanced Exploration
Type of Work: Surface
Location: British Columbia, Canada
                 

Commodities: Copper, Gold, Silver, Zinc
New to Company & PropertyMine?
Start Here »


Latest Information
October 31, 2006
Announced drill results. Highlights include: hole RH-06-25: 1.74 m @ 10.15% Cu, 5.45% Zn, 1.41 g/t Au.
July 31, 2006
Four holes totaling 1120 metres of drilling were completed to test a Time Domain EM geophysical conductor detected in a down-hole survey completed in May in hole No.05-23 drilled in 2005 in the Red Hill sector. Hole No.06-24 tested the conductor approximately 30 metres north of hole No.05-23 and intersected 19.5 metres of massive sulphide mineralization from 144.0 to 163.5m down the -71 degree inclined hole which is roughly the same depth as the intercept in hole No.05-23. A second hole (No.06-25) drilled at a steeper angle (-82 deg.) from the same set-up intersected 5.5 metres of similar pyrrhotite-rich mineralization from 150.4 to 155.9m. This was followed by a second 1.8m wide zone of massive and semi-massive sulphides at a depth of 214.3 to 216.1m that consisted mainly of chalcopyrite mineralization with lesser pyrrhotite and pyrite. Hole No.06-24 intersected a zone of disseminated to semi-massive pyrite-pyrrhotite-chalcopyrite from 199.2- 201.5 m that may correlate with the lower zone in hole No.25.
January 30, 2006
Reported encouraging copper mineralization at the property. One hole drilled intersected two narrow bands of massive sulphide mineralization assaying 2.08% Cu, 7.5 g/t Ag over 1.35m and 0.56% Cu, 0.79g/t Ag over 2.95 m. The assay results from drilling program was completed in November, 2005. The results of the program have confirmed the validity of the Company's new structural model and demonstrated good potential for economic copper-zinc-silver VMS deposits. A follow-up program involving geophysical surveys and further diamond drilling is planned for 2006.

Copyright © InfoMine Inc. Developed and maintained by InfoMine Inc. All rights reserved.