Further ridge and spur soil sampling and rock chip sampling was completed.
June 30, 2002
Further ridge and spur soil sampling and rock chip sampling was completed.
July 31, 1998
Mapping, soil sampling, IP/resistivity and trenching had confirmed the extension of the Kiosk vein system onto the property. A zone of extensive alteration was identified. Further work was planned.