Field investigations were undertaken in preparation for drilling and exploration over a 3-6 month timeframe.
June 5, 2008
Structural mapping over Mt Bundey and Rum Jungle will be completed this field season, with follow-target evaluation being conducted during late 2008.
December 31, 2007
Reported that six RC holes were drilled for 770m to test mineralisation north of the former uranium open cut at RJCS. Some encouraging uranium mineralisation was intersected and together with the largely untested area south of the RJCS open cut will be further drill tested during 2008.Drill hole 07RJCS03 stopped in mineralisation. Highlights include in hole 07RJCS04 with 9m at 1.53 lb/t U3O8 from 43m and in 07RJCS05 with 9m at 1.55 lb/t U3O8 from 47m