September 30, 1997 Drill holes #12-17 were completed in the Hilltop zone and confirmed the presence of highgrade gold throughout.
September 30, 1997 Drill holes #12-17 were completed in the Hilltop zone and confirmed the presence of highgrade gold throughout.
August 31, 1997 Metallic screen analysis were confirming that a significant percentage of the gold in the ore was coarse gold. RL97-09 measured 0.13 oz/t Au from 195-210 ft, RL97-11 measured 0.08 oz/t Au from 90-220 ft, including 10 ft at 0.15 oz/t Au and 10 ft at 0.20 oz/t Au. Drilling was to continue at the rate of 15-20 holes per month through the winter and into 1998.