January 25, 2012 West Wits Mining Ltd. has agreed to sell to a South African consortium the West Wits Lease, West Rand Consolidated Lease, Luipaardsvlei Lease and East Champ D’Or Lease.
December 1, 2008 Announced it has received all gold assays for the Phase 1 exploration program completed at the
Radiant Target. A total of 3 reverse circulation (RC) and 21 diamond drill (DDH) holes (8 holes with RC precollars)
were drilled for a total of 5,204m to a maximum vertical depth of 220m. The program was designed to test both near surface and deeper gold mineralisation on 100m section lines over the unmined section of the Kimberley Reef. Significant intercepts include:
o 4.5m @ 2.91g/t Au from 239.35m (RLKPD021) - (Incl. 1m @ 4.73g/t Au)
o 2m @ 4.06g/t Au from 268.37m (RLKPD020) - (Incl. 0.5m @ 11.42g/t Au)
September 30, 2008 A total of 4,670m of drilling was completed across the Radiant Target with intersections of multiple high sulphide mineralised conglomerate reefs intersected. All known individual conglomerate bands within the Kimberley Reef were intersected. The initial drilling program is anticipated to provide enough information to construct a JORC compliant resource by late December 2008 to January 2009.