Global InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps Software
Investment Commodities Properties Equipment Consultants EduMine Technology Events Mineweb
Blogs Mine Sites Mine Costs About Contact eStore Advertise Subscribe MINING.com
 

SAN JOSE PROJECT

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
SAN JOSE PROJECT
Classification: Active/Verified
Status: Development
Type of Work: Underground
Location:
Mexico, Oaxaca
Nearest Landmark: OAXACA
Distance from Landmark: 47 km
Direction from Landmark: South
Latitude: 17 Degrees 8 Minutes (North)
Longitude: 97 Degrees 10 Minutes (West)
Advanced or Above
    Subscriber Access Required


Property News

October 26, 2009
Fortuna Silver Mines announced an updated NI 43-101 compliant mineral resource estimate for the San Jose Project located in southern Mexico. Indicated Resources have increased 83% to 2.69 million tonnes with contained silver equivalent ounces increasing 112% to 37.6 million. Silver and gold grades in the Indicated Resource category have increased by 12% to 295 g/t and 4% to 2.27 g/t, respectively. The new resource estimate will serve as the basis for pre-feasibility level engineering studies projected for completion by year end. The estimates are based on a cut-off grade of 150 g/t Ag Equivalent for the Indicated and Inferred Mineral Resources of the Trinidad Zone.
May 25, 2009
Fortuna Silver Mines report that the road blockade reported in a company news release dated April 16th, was brought to an end on May 6th by Federal and State police, as a result of a call to action by local Municipal and Ejido authorities. The company and local authorities are engaged in dialogue with the fringe group of demonstrators in order to ensure an equitable long term solution to their concerns. A police detachment remains on-site to assure there are no further disruptions on the access road to the town and Project. The company is in the process of gradually reinstating its ground activities.
March 11, 2009
Announced the completion of the 2008/2009 in-fill drill program on the Trinidad Zone of the San Jose silver-gold project. The program has confirmed the presence and consistency of high-grade silver-gold mineralization in association with hydrothermal breccias, crackle breccias, quartz-carbonate veins and zones of sheeted and stockworked quartz-carbonate veinlets.Hole SJO-127 returned 14.22 m true thickness grading 6.75 g/t Au and 933 g/t Ag from 394.5 m.

Property Satellite Image

Click here to view 3D Fly-In of area
*Requires Google Earth application.
Download the application here for free. Need help with Google Earth?
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish