Property News
April 30, 1996
A stream sediment sample was 2/3 completed. Six potential kimberlitic targets had been identified of which 3 lied in an area where positive results were obtained during stream sampling programs. A regional soil sample was to be completed in 1996.
April 30, 1996
A stream sediment sample was 2/3 completed. Six potential kimberlitic targets had been identified of which 3 lied in an area where positive results were obtained during stream sampling programs. A regional soil sample was to be completed in 1996.
March 31, 1995
Stream sediment sampling was underway on the property.