|
Property NewsDecember 31, 1999 Quarter, the operation was cleaned up and closed. Drilling resumed at Chariot, with 19 holes completed for the quarter. Results from Main shoot include 5 m at 23.9 g/t, 5 m at 20.0 g/t, 14 m at 12.3 g/t, 10 m at 15.5 g/t, 15 m at 37.0 g/t and 12 m at 21.3 g/t, with mineralisation open at depth and to the west. A preliminary resource estimate is scheduled for January 2000. Preliminary metallurgical testing achieved recoveries of 98% with acceptable reagent consumption. December 31, 1999 Quarter, the operation was cleaned up and closed. Drilling resumed at Chariot, with 19 holes completed for the quarter. Results from Main shoot include 5 m at 23.9 g/t, 5 m at 20.0 g/t, 14 m at 12.3 g/t, 10 m at 15.5 g/t, 15 m at 37.0 g/t and 12 m at 21.3 g/t, with mineralisation open at depth and to the west. A preliminary resource estimate is scheduled for January 2000. Preliminary metallurgical testing achieved recoveries of 98% with acceptable reagent consumption. August 31, 1999 Mining operations ceased at White Devil after 12 years of operations and production exceeding 750,000 ounces. Milling of stockpiles was expected to conclude early in the December quarter.
|