TOSON TERRACE DEPOSIT (066)
Archived

Au
1,354.86
USD/oz
0.03
green
Data as of May 20, 2013 03:09PM UTC


Key Facts
Status: Exploration
Type of Work: Placer
Location: Mongolia
                 

Commodities: Gold
New to Company & PropertyMine?
Start Here »


Latest Information
September 30, 1998
The design and manufacture of a gold recovery plant for the open pit treatment of gold-bearing gravels was completed. The gold recovery plant is currently being commissioned.
September 30, 1998
The design and manufacture of a gold recovery plant for the open pit treatment of gold-bearing gravels was completed. The gold recovery plant is currently being commissioned.
October 31, 1997
Operation were suspended due to difficulties in equipment and spare part acquisition. The plant was placed on care and maintenance. In 1997, a 30,000-cubic-metre stockpiling program was carried out during the season. This stockpile was in place for future processing. 71,000 ounces of gold in 8.0 million cubic metres of material grading 276 milligrams of gold per cubic metre were estimated to be contain within the license area.