June 5, 2007 The project has so far defined 23 drill ready, kimberlite potential, magnetic targets. Drill testing 10 to 15 targets in 2007 is anticipated.
September 30, 2006 A 6 hole, 931m drill program was completed in September 2006 that drill tested 6 targets in the Trillion projec area. Kimberlite was not intersected.
March 1, 2006 Sediment sampling was conducted simultaneous to the claim staking and kimberlitic indicator mineral picking results from samples processed at SouthernEra’s in-house laboratory are expected in the second
quarter 2006. Winter ground geophysics, began in late February and will initially cover 22 airborne targets. Follow-up sediment sampling in conjunction with additional ground geophysics over the remaining targets will be completed this summer to prioritize targets for drilling.