TUOLE
Location:
China, Xinjiang
|
Property NewsAugust 12, 2008 The planned 2000 meter diamond drill program is scheduled to begin on the Tuole West permit in late August 2008. In addition to the diamond drilling, a program of surface trenching on Area C of the Tuole West permit is planned. May 31, 2008 The 2008 exploration work program includes diamond drilling of 2050 m on Area A expected to start by August 2008. As well, the program includes surface trenching of 1,160 m³ on Area C on the Western Tuole Exploration permit, surface trenching of 400 m³ on Northern Tuole Au Exploration permit, and soil geochemical survey of 4.0 km² on Eastern Tuole Au Exploration permit.
During 2007, surface trenching on Area A has determined three gold-bearing alteration zones, hosted by fault fracture zones. These alteration zones trend approximately east-west and dip steely to the north, with strike length ranging from 100 metres to about 800 metres and width ranging from 8 metres to 20 metres. As well, surface trenching on Area C intercepted widespread Cu mineralization. This preliminary work will be followed up by further trenching, sampling and diamond drilling during 2008. (Feb 29/08) October 3, 2007 Further exploration was completed during 2006 and an active exploration program in the field was underway, consisting of mapping, sampling, trenching, geophysical and geochemical surveys and to identify drill targets. A diamond drill program is planned for the spring of 2008.
|