April 22, 2008 Announced the results of diamond drill holes VL08-12 and VL08-13 at Drake Hill, on the Voltaire Lake property. The most significant mineralization was a 12.25 m interval in hole VL08-13, including 2.34% copper and 0.13% nickel over 0.90 m from 197.48 m, and 6.00% Cu and 0.28% Ni over 0.28 m from 198.10 m. The present drill results confirmed the continuity of mineralized zone intersected in VL08-03A and discovery of a new deeper horizon in hole VL08-13.
February 20, 2008 Announced the completion of the Phase 1 diamond drilling program on the Voltaire Lake property. The last two drill holes encountered sulphide mineralization. As a result of these findings, more ground has been strategically staked. Upon completion of a ground geophysical survey is now underway in this Drake Hill zone.
January 16, 2008 Announced the results of assaying of diamond drill holes VL07-03A, -04 and -05, drilled to test conductors under Proterozoic cover rocks on its Voltaire Lake property. Hole VL07-03A cut 2.0 m averaging 0.87% Cu and 0.15% Ni, which is part a larger 10.75 m sulphide-bearing zone with individual assays up to 1.05% Cu and 0.43% Ni, averaging 0.34% Cu and 0.08% Ni over 10.75 m. A separate intersection included 1.0 m of 1.2 g/t Pd.