Underground drilling continued to confirm the presence of mineralisation below the old NO2 ore body. Results during the quarter included:
- UWA-08-010: 7.40 metres @ 6.60% nickel (true width 3.70 metres)
August 6, 2008
Announced the end of remnant mining operations, due to the long-expected depletion of viable ore reserves. The mine will be placed on care and maintenance as of close of business on Friday 8th August
June 30, 2008
Reported more drill results. Hole UWA-08-006 intersected nickel sulphides in the footwall basalt, returning 0.65 metres @ 9.57% nickel from 211.66 metres (true thickness 0.46 metres)