Xemplar Energy reported chemical assay results for an additional 25 drill holes from the ongoing 2009 drill program at the Big Yellow mineralized zones at the Warmbad Uranium project in southern Namibia. Highlights includes RCBYE0064 intersected 26m at 0.012% U3O8 from 30m depth including 1m at 0.026% U3O8 from 32m, in RCBYE0065 returned 19m at 0.013% U3O8 from 72m including 2m at 0.038% U3O8 from 89m and in RCBYE0067 found 22m at 0.012% U3O8 from 16m. In addition to the above assay results reported for Big Yellow East, 25 intervals of 1 to 4 meters with grades ranging from 0.01% to 0.030% were also noted
Xemplar Energy announced chemical assay results for an additional 18 drill holes from the 2009 drill program at Aluriesfontein located at the Warmbad Uranium project in southern Namibia. Highlights includes from Hole DDALU006 with 0.017% U3O8 over 4m from 10m downhole including 0.038% U3O8 over 1m from 42m, in Hole RCALU0114 returned 4m at 0.035% U3O8 from 19m and in Hole RCALU0123 intersected 18m at 0.011% U3O8 from 7m.
Xemplar Energy Corp. report chemical assay results for a further nineteen drill holes from the company’s 2008/2009 drill program at the Big Yellow mineralized zones located at its 100% owned Warmbad Uranium project in southern Namibia. Highlights of chemical assay results from the company’s 2008/2009 drill program at Big Yellow West, East, and Center include from RCBYW0026, 895.5 ppm (0.090%) U3O8 over 3 meters from 45 meters to 48 meters (including 1 meter from 45 to 46 meters at 1,824.5 ppm, or 0.182% and including 1 meter from 46 meters to 47 meters at 766.0 ppm or 0.08%).