Airborne EM and magnetic/radiometric surveys were completed over EL 23630. Preliminary results of the EM and magnetic/radiometric surveys indicate a number of anomalies for follow up during the June quarter. Drilling is scheduled for the September quarter.
June 13, 2007
A helicopter-borne EM survey is proposed over the prospective lithological and structural units within the Winnecke Goldfield. Ground magnetics followed by RC drilling is proposed at the Sliding Rock Well Prospect.