Latest Information May 31, 1999 Water levels on the access road receded and the shipping of stockpile silver-gold screened concentrate commenced. March 31, 1999 A stockpile of approximately 3,000 tons of silver-gold screened concentrate was to be leached and trucked to a tank set-up to produce a silver-gold bullion as soon as water levels on the access road receded. Mine crews were then to screen the gold-silver bearing quartzite in the stockpile and mine operations were to continue. October 31, 1998 A geological survey had been completed. The work outlined 5 veins and 1 highly leached ore zone as well as a large 20 m wide quartzite bed which contained gold and silver values in multiple fractures. |