|
Property NewsApril 30, 2000 A Phase I program of pitting, trenching and auger drilling was planned. April 30, 2000 A Phase I program of pitting, trenching and auger drilling was planned. November 30, 1998 The property was entirely prospected and covered with a geochemical soil sampling survey wihich included 5,320 laterite soil samples and 203 stream sediment samples. A total of 68 distinct gold anomalies as well as numerous artisanal mining sites were outlined.
|