|
|


 |
SERVICES
- Pit Optimization
- Open Pit Design
- Production Scheduling
- Equipment Selection
- Road and Ramp Design
- Mine Simulation and Computer Modeling
- Economic Analysis
- Strategic Mine Planning
MOST RECENT PROJECTS
- GEOLOGIX, San Augustine, poly metal project, Mexico, Strategic mine planning and Pit optimization
- Silver Standard, Diablillos, Silver/Gold project, Argentina, Pit optimization and Mine design
- Far West Mining Ltd., Santo Domingo Project, Chile, Strategic mine planning and Pit optimization
- Mediterranean Resources Ltd. (Gold), Open pit optimisation, Mine design, Scoping study
- Tyhee Development Group, Yellowknife Gold Project, (Gold), Reviewing the previous works and project evaluation
- Ironbark, Citronen zinc and lead project, Greenland, Pit optimization and strategic mine planning
- AGNICO-EAGLES, Meadow Bank Project, Open Pit design for Portage, Goose Island, Vault gold deposits
- Luzon Minerals, Amayapampa gold project, Bolivia, pit optimization.
- YeallowHead Mining Inc. Harper Creek copper project, BC Canada, Pit optimization
- Mediterranean Resources Ltd., TAC project, Turkey, Scoping Study
- Endako Mines. (Molybdenum), (Multiple Projects), Open pit optimisation, Mine design, Production scheduling, DCF analysis, 30,000t/day mill capacity
- Viceroy Exploration Ltd. (Gold), (Multiple Projects), Open pit optimisation, Mine design, Scheduling, Access road design, Waste dump design, DCF analysis, 21000t/day leach pad capacity
- Ashton Mining of Canada (Diamond), Preliminary open pit optimisation, Mine design, Scheduling, DCF analysis, 5000t/day mill capacity
- Agrium KPO, (Phosphate), Open pit optimisation, Detail mine design, Yearly production scheduling, Long-term grade control studies, 1 million tonne concentrate/year
- Cross Lake Minerals Ltd. (Gold), Technical review, Pit optimisation and pit design for two open pits, Production scheduling, 900t/day mill
- Bema gold corporation(Gold), Kupol mine project, Cost modeling
- SUNCOR Energy, Fort McMurray, AB (Oil sand) - Pit Optimization, Economic modelling of the deposit, Finding the bottom of the pit, Working on marginal grades.
- Elk View Coal Operation, BC (Coal)- Hybrid pit, innovation research, Reducing the project risk using simulated models.
– Pit Optimization, Smoothing stripping ratio, Evaluation the impact of the office and facilities site relocation.
PAPERS
Bozorgebrahimi, E., 2008, Mine Road Design using SURPAC; GEMCOM, SURPAC, WHITTLE User Conference, Vancouver, April 2008
- Whittle, D. Bozorgebrahimi, E., 2007, Hybrid Pits - Linking Conditional Simulation and Lerchs-Grossmann through Set Theory, Orebody Modeling and Strategic Mine Planning conference, Perth, Australia, (an older version of this paper was published in the same journal in 2005)
- Bozorgebrahimi , A., Hall, R.A., Morin, M., 2004 The Evaluation of Equipment Size Effects on Open Pit Mining International Journal of Surface Mining, Reclamation and Environment
- Bozorgebrahimi, E., Hall, R., 2004, Equipment Size Effects on Open Pit Mining Performance, CIM Annual Meeting and Exhibition, Edmonton, Canada.
- Bozorgebrahimi, E., Hall, R., Scoble, M., 2003, Economies of Scale in Surface Mining Equipment: Dimensions and Impact Analysis, Twelfth International Symposium on Mine Planning and Equipment Selection, Kalgoorlie, Australia, Proceedings pages 323 to 329
- Bozorgebrahimi, E. Hall, R., Blackwell, G., 2003, Economies of Scale in Surface Mining Operations; A Case Study of the Impact of Haul Truck Size on Maintenance Cost, SME Annual Meeting and Exhibit, Cincinnati Ohio, USA, Preprint 03-020.
- Bozorgebrahimi, E. Hall, R., Scoble, M., 2003. Sizing Equipment for Open Pit Mining - Identifying and Quantifying the Factors, Institution of Mining and Metallurgy (IMM)
- Bozorgebrahimi, E. Hall, R., Scoble, M., 2002. An Investigation of the Impact of Haul Truck Size in Surface Mines on Maintenance Cost, Journal of Mines, Metals & Fuels, Incorporating Indian Mining Journal October-November pages 371-379, ISSN 0022-2755
- Bozorgebrahimi, E. Hall, R., 2001. An Investigation into the Use of the Vital Information Management System™ at Highland Copper Mine, Industrial report.
- Bozorgebrahimi, E. 1996. Final pit excavation limits for Chahkhaton open pit gold mine. Proc.,Gold Mining Seminar, Isfahan, Iran, Proceeding pages 28 to 45.
- Bozorgebrahimi, E. 1991. Importance of training in decorative stone mines. Proc., The Second Decorative Stones seminar, Shiraz, Iran, Proceeding pages 3 – 17.
- Bozorgebrahimi, E. 2003, An investigation into the implementation of large-scale mining equipment effect on mining industry, Cordilleran Exploration Roundup, Vancouver, Canada
- Bozorgebrahimi, E. 2002, An investigation into the implementation of large-scale mining equipment effect on mining industry, The First Annual UBC-CERM3 Workshop Symposium Vancouver, Canad
|
 |

| Address: |
Specializing in Mine Design North Vancouver, British Columbia Canada, V7N 3S2 |
|
| Phone: |
+1 604 202-6166 |
| Contact: |
Anoush Ebrahimi, President & CEO Email
|
|
Categories of Goods and Services Provided
Consulting Services - Exploration - Data Management, Consulting Services - Management & Financial - Due Diligence, Consulting Services - Mine Planning - Mine Design, Consulting Services - Mine Planning - Open Pit Design, Consulting Services - Mine Planning - Pits & Quarries
Product/Service List Converting Old Data into Electronic Formats, Database Management, Database Management, Economic Analysis, Equipment Selection, Mine Simulation, Mining Engineering Services, Open Pit Design, Orebody Modeling, Pit Optimization, Production Scheduling, Specialized Website Services for Mining Companies, Waste Dump Design
|