Camino Rojo

Key Facts
  • Asset TypeProject
  • LocationMexico

Looking for more information?

  • • Altitude
  • • Climate data
  • • Production information
  • • Reserves
  • • Owners
  • • Location
  • • Searchable reference documents
  • • Mine type
  • • Latest staff numbers
  • • Contact lists
  • • Comparable properties

See the different subscription options
Latest Information
  • 2013 Production And Reserves/Resources Results
    Goldcorp Inc. Released Production Results.
    On 2014-02-13
  • News Release-English
    Goldcorp Inc. Announced its Financial and Production Results.
    On 2012-04-25
  • Canplats Resources Acquisition Completed
    Canplats Resources Acquisition Completed
    On 2010-02-04
  • Preliminary Assessment for Camino Rojo Project -(CPQ )
    Canplats Resources Corporation Announced the Completion of a Positive Preliminary Assessment on the 100 %-Owned Camino Rojo Gold Project Located in Zacatecas State,Mexico. the Preliminary Assessment Supports Open-PIT,Heap-Leach Mining of Oxide and Transitional Mineralization at the Represa Deposit. the Study Does not Examine the Extensive Sulphide Mineralization That Exists at Camino Rojo. Base Case Ultimate PIT Contains1. 71Million Ounces Gold and34 .2Million Ounces Silver(74.9Million Tonnes Grading0. 71G/T AU and14 .2G/T AG)With a LOW Strip Ratio of0.7to1. Average Annual Production is Estimated at122, 300 Ounces of Gold and 902,100 Ounces of Silver Over a 10.4Year Mine Life at a NET Cash Operating Cost of US $340PER Ounce of Gold(Including Silver Credits). Initial Capital Costs are Estimated at US $133.8Million. a PRE-Tax Internal Rate of Return of 32.5% is Expected and the Project has a NET Present Value of US $194.9Million at a5% Discount Rate,Increasing to 65.7% IRR and a US $477.2Million NPV at Current Metal Prices of US $1,036PER Ounce Gold and US $17 .19 PER Ounce Silver.
    On 2009-10-19
  • Camino Rojo PRE-Feasibility Study Announced -(CPQ )
    Canplats Resources Announced That the in-House Technical Assessment of the Represa Zone has now Been Completed and the Company has Engaged Mine and Quarry Engineering Services,Inc.Of SAN Mateo,California,to Conduct a PRE-Feasibility Study for the Project.
    On 2009-09-24