Beaverdam Lithium

Key Facts
  • Asset TypeProject
  • LocationUnited States

Looking for more information?

  • • Altitude
  • • Climate data
  • • Production information
  • • Reserves
  • • Owners
  • • Location
  • • Searchable reference documents
  • • Mine type
  • • Latest staff numbers
  • • Contact lists
  • • Comparable properties

See the different subscription options
Latest Information
  • Beaverdam Drilling Results
    North Arrow Minerals Provided an Update on its Recent Drilling Program at the Beaverdam Lithium Project Located in North Carolina,Usa. Drill Holes 10- BD -13 Through 10- BD -15 Were Drilled Along a 500 M Strike Length of the Eastern Pegmatite Trend. all Holes Were Drilled at an Angle of -45 Degrees and Each Encountered Between4and6Mineralized Pegmatites Exceeding2M in Width With Highlight Intervals Including1.14 % LI2O Over9. 95M Starting at116.9M in 10- BD -13 and1.09 % LI2O Over11 .3M Starting at193.25 M in 10- BD -14 .
    On 2010-07-14
  • CAN $1M Private Placement,Beaverdam Update
    North Arrow Announced it has Arranged a non-Brokered Private Placement of5,560,000Units at a Price of CAN $0.18 PER Unit,for Gross Proceeds of up to CAN $1,000, 800 . the NET Proceeds of the Private Placement Will be Used to Advance the Beaverdam Project as Well as the Company’S LAC DE Gras Diamond Project and for General Working Capital. the Company's 2009Drilling Program at the Beaverdam Project in USA Consisted of Twelve Drill Holes (1,235Meters(M)) and Final Assays From Holes09-BD -09 ,09-BD -11 and09-BD -12 Include1.16 % Lithium Oxide(LIO2) Over7.57 M.
    On 2010-03-19
  • Beaverdam Drill Results
    North Arrow Minerals Provide Initial Assay Results From Recent Drilling at its Wholly Owned Beaverdam Lithium Project in North Carolina,Usa. Drill Hole09-BD -06 was Drilled at-75Degrees,Intersecting13 Intervals of Mineralized Pegmatite Including13 .0M Grading1.24 % LI2O.
    On 2009-12-10
  • North Carolina Drilling Commenced
    North Carolina Drilling Commenced
    On 2009-10-14
  • North Carolina Project Drilling to Commence
    North Carolina Project Drilling to Commence
    On 2009-09-23