The Davidson Deposit feasibility study, compiled by Hatch Ltd. with contributions from several
consulting firms, evaluates the potential for mining 2,000 tonnes per day over a 10-year period of
the highest-grade molybdenum-containing ore from the deposit and trucking it 200 kilometers to
the Endako Mine for processing.
The study assumes that 7.3 million tonnes of proven and probable mineral reserves plus 0.5
million tonnes of sub-grade material will be mined and processed over 12 years, of which 10
years would be at full production. The average grade is estimated at 0.265% contained
molybdenum (Mo).
Total molybdenum production after milling and roasting is estimated at 40.3 million pounds Mo
or an annual production rate of approximately 4.5 to 5.0 million pounds Mo during the initial full
production years, tapering down to average approximately four million pounds per year over the
study period.
The underground development would include the construction of a three-kilometre adit as a
haulage ramp from the base of the mountain upward toward the deposit at an incline of
approximately 10% and the enlargement of an existing two-kilometre adit to be used for airintake
ventilation and as a secondary access to the deposit.
Major items of surface infrastructure would include a water treatment plant, access roads, on-site
buildings, and ore-handling facilities at Endako.
Location Summary
- Nearest Landmark: SMITHERS
- Distance from Landmark: 9Km
- Direction from Landmark: NW
- Latitude: 54deg 49Min N
- Longitude: 127deg 18Min W
- Satellite Image: Click to View »
Ownership Summary
- Name: Thompson Creek Metals Company Inc.
- Interest: 100%
- Note: Public
Reference:20 November 09